PILOT ACCEPTANCE WORKSHEET Blank fields — copy for each candidate Candidate / configuration version: ___ Product / permitted market / partner model: ___ Owner / engineer / second reviewer: ___ Authorised test environment / payout isolation evidence: ___ Source system / business ID / platform ID: ___ Customer / subscription / invoice / refund ID: ___ Expected partner / attribution rule version: ___ Business status before → after: ___ Commission expectation / observed vendor status: ___ Event time / received time / timezone: ___ Review deadline / lock or invoice boundary: ___ Evidence reference / exception owner / retest date: ___ Result: PASS / FAIL / NOT DEMONSTRATED TEST MATRIX — apply to both candidates ORDER: accepted order → one traceable business result. REPLAY: same order event → no additional eligible commission. REFUND: full return before correction boundary → original result ineligible, reason retained. LATE: correction after boundary → documented escalation, no silent rewrite of finalised history. TRIAL: trial without verified payment → no eligible commission under this pilot rule. PAID: verified first payment → same customer, agreed partner, linked invoice. RENEW: later payment → same subscription, separate invoice/event identity. CHANGE: upgrade/downgrade → recorded transition, no invented new acquisition. CANCEL: stop future renewal → no assumed future sale; historical valid invoice retained. RETURN: refund renewal → renewal corrected, valid initial acquisition retained. MISSING: absent customer link → visible exception and supported recovery. CONFLICT: competing partner claim → recorded ownership decision before approval. FILLED EDUCATIONAL EXAMPLE — synthetic, not a vendor test result Candidate: demonstration A; configuration: DEMO-v1. Source: synthetic billing ledger; reviewer: review role. Links: C-DEMO / S-DEMO / I-RENEW / R-RENEW; partner P-A. Before: renewal paid, commission awaiting review. Input: full refund R-RENEW before agreed review boundary. Expected: renewal refunded, its commission ineligible. Keep: I-FIRST and initial acquisition unchanged. Illustrative observation: linked renewal corrected; initial record retained. Evidence: synthetic ledger row + linked demonstration record. Result: PASS for this row only, not acceptance of a platform. Open issue: late correction route not demonstrated; owner engineer. Overall decision: STOP until late-correction evidence and retest exist. CHECKLIST AND DECISION [ ] Safe test route and exclusion from real payouts confirmed. [ ] Same fixtures and rules used for both candidates. [ ] Every mandatory row has linked evidence and reviewer. [ ] No duplicate eligible result, orphan record or unexplained cancellation. [ ] Open exceptions remain visible; deadline and escalation owner recorded. [ ] Export independently reproduces source-to-platform mapping. PASS only when every mandatory row passes. FAIL on mismatch; STOP expansion while any mandatory row fails or is not demonstrated. After repair repeat the failed fixture and a normal control. Decision / limitations / next permitted step / reviewer / date: ___